Quality control
Inspection holds before finished goods hit stock
BOM, work orders, and shop-floor posting on one ERP spine — planning and WO for SMB factories and assembly shops.
QC hold
Batch QC-88 pending
QuarantineAdmin panel
The same ERP you activate in sandbox
Mrfqy ERP admin panel — same signup path as the live sandbox.
Mrfqy ERP · Quality
Quality checks
Checks today
16
Failed
1
Hold
2 lots
Incoming QC Lot B-12 | PASS |
Line inspection Shift A | PASS |
NCR #44 Review | OPEN |
Shop-floor workflow
Plan to cost.
Multi-level BOM
Components, sub-assemblies, and scrap factors.
Production orders
WO queue with material issue and receipt.
Quality holds
Quarantine and release before stock moves.
Job cost rollup
Material, labor, and overhead on finished goods.
Why factories switch
- Planning app for capacity and shifts
- Purchasing ties to BOM shortages
- Depreciation app on roadmap (Phase 87-D)
- Honest depth — Alpha where MRP is partial
- Same account as inventory and finance
Quality control FAQ
SMB manufacturing.
Explore Mrfqy OS
ERP at the center — store, POS, websites, and domains on one spine.
