Roll up material, labor, and overhead on each production run
BOM, work orders, and shop-floor posting on one ERP spine — planning and WO for SMB factories and assembly shops.
Job cost
Admin panel
The same ERP you activate in sandbox
Mrfqy ERP admin panel — same signup path as the live sandbox.
Mrfqy ERP · Finance
Job costing
WIP
EGP 420k
Margin
22%
Overruns
2
WO-2403 cost Materials + labor | LIVE |
Variance EGP 8k | REVIEW |
COGS post Scheduled | PLANNED |
Shop-floor workflow
Plan to cost.
Multi-level BOM
Components, sub-assemblies, and scrap factors.
Production orders
WO queue with material issue and receipt.
Quality holds
Quarantine and release before stock moves.
Job cost rollup
Material, labor, and overhead on finished goods.
Why factories switch
- Planning app for capacity and shifts
- Purchasing ties to BOM shortages
- Depreciation app on roadmap (Phase 87-D)
- Honest depth — Alpha where MRP is partial
- Same account as inventory and finance
Manufacturing job costing FAQ
SMB manufacturing.
Run manufacturing job costing
sector=small_factory or assembly_workshop.
Explore Mrfqy OS
ERP at the center — store, POS, websites, and domains on one spine.
